Some from yesterday and this AM

Below, drain holes for the anchor well…

IMG_20160514_094902003-001Drains from the inside…

IMG_20160514_095005469-001

 

Electrical conduit (plastic) fitting. Note inside shoulder. I will cut it off about there.

IMG_20160514_094921103-001

And epoxy in the drain holes to seal ply edges. Should end up about 1/8″ proud of surface. 

IMG_20160514_094951835-001

 

Lower lee board mount shaped and sanded.

IMG_20160514_095031956-001Another view of same…IMG_20160514_095049513_HDR-001

 

Top mount with slot cut and ready for a test fit (it won’t, never does!) as soon as I get some help to tilt the boat over on the trailer for lee board clearance.

IMG_20160514_115000380_HDR-001

Un Abrazo,

Bill

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: